Floor Joists and Subfloor Progress







This weekend (9.11 - 9.12.2010) we worked on installing the floor joists in the dining room, kitchen and entry area. Once the joist were installed, we carried the 3/4" subfloor decking into the living and dining rooms and around the fireplace.